Productive and Mushroomy Weekend

What a great weekend! Took Friday off and started working on the barn again in the sunny fall weather. Got some nit picky things done, and then on Saturday went in to Seattle to have a nice day in the city. Helped Bob with some tree removal in the AM, then went to the PNW [...]

0 Comments

A new beginning.

Last year was pretty much the pits, so I’m going to start fresh. So far, living at Bearwoods has gotten pretty routine. New batteries and LED lights let me enjoy the trailer life a bit more. A new charge cable for the truck lets me charge the trailer batteries when the sun can’t do it. [...]

0 Comments

Topped out!

Finally! I topped out the ‘Barn’ as I am now calling it, yesterday about mid afternoon. All the rafters in place and a tarp over it for the rain which began in earnest about 5PM. Had about an inch of rain last night and not a drop of rain on my dry construction. Yay! Now [...]

0 Comments

Second Floor

Today was productive, finished up some minor corrections on the first floor walls, then squared the building and finally put the second floor joists and floor sheathing on. Woohoo! Looks great and standing up there is amazing. Tomorrow is more walls and a temp roof for the rain that is supposed to fall on Thursday…

0 Comments

New Journal.

I’ve completed installing and tweaking this new journal system from b2evolution. Works pretty good and it will be much easier to make entries now. Before I had to edit the html to make an entry. The items below are this years posts, entered in order, with the date of the original post in the first [...]

0 Comments

Working the whole weekend!

Again worked the entire 3 day weekend on this project. Saturday I finished up the wood frame floor by insulating and applying the plywood floor on top of moisture barrier. Sunday I started by laying down 3 layers of material on top of the concrete block wall, closed cell foam layer, aluminum flashing layer, and [...]

0 Comments

Wood working weekend…

Worked most of the long weekend on the wood part of the floor system. Half of the building has a concrete foundation and half has a raised post and beam floor. My friend George came out to help and was a great help sawing the joists by hand, nailing and helping me apply plywood to [...]

0 Comments

Finished Concrete Work.

Finally finished the concrete work on the well house. What a pain! But it was a challenge and I met it. Started working on the floor system of the portion of the well house that is post and beam supported. The building sits on a partial slope, so about half is concrete foundation and floor, [...]

0 Comments

Preliminary home design

Just finished the prelim design for my current house plan. So far the interior works, and the exterior works for me also. I’m using a program called SketchUp for this part of the project. It’s fairly easy to create 3D models with it, though logs are not the easiest. This model has about 500 sq. [...]